T-REC Issuance

Cumulative Generation: 14,152,475 MWh (Through Apr 2026)
817,249 MWh Generated (Jan 2026 – Apr 2026)

# Organization name Site name Energy type Year of issuance Generation traded (MWh) Generation remaining (MWh)
1201
Apollo power co., ltd.
Niucuo Vil Rooftop PV
Solar Energy 2026 92.487 0 Detail
1202
Greenet
Solar Energy 2026 39.763 43.634 Detail
1203
natural power co. ltd.
na
Solar Energy 2026 50.278 52.072 Detail
1204
YIHO Green Energy Transformation Co. Ltd.
N/A
Solar Energy 2026 0 79.89 Detail
1205
Foxwell Power Co., Ltd.
Pin Feng Industrial PV Project
Solar Energy 2026 93.378 0 Detail
1206
TATUNG FOREVER ENERGY CO., LTD.
Changhua County Polluted Farmland Solar Photovoltaic System - Land No. 551、552 of Dajia Section
Solar Energy 2026 111.006 0 Detail
1207
Formosa Solar Electricity Business Co., Ltd.
Ri Pei Power Co., Ltd. (TW170576)
Solar Energy 2026 0 45.855 Detail
1208
Anneal Energy
TAIYUAN CERAMIC CO.,LTD.
Solar Energy 2026 85.061 0 Detail
1209
TATUNG FOREVER ENERGY CO., LTD.
Kaohsiung Gangshan Cultural Center (Phases 1 and 2)
Solar Energy 2026 101.332 0 Detail
1210
Greenet
Solar Energy 2026 .711 97.549 Detail

PAGE 121 OF 500

SHOW

PAGE