T-REC Issuance

Cumulative Generation: 7,355,810 MWh (Through Dec 2024)
3,210,448 MWh Generated (Jan 2024 – Dec 2024)

# Organization name Site name Energy type Year of issuance Generation traded (MWh) Generation remaining (MWh)
1341
TATUNG FOREVER ENERGY CO., LTD.
The third batch of solar energy construction projects on polluted farmland in Changhua - Land No. 106, Changxing Section, Changhua City
Solar Energy 2024 61 0 Detail
1342
Mr.Watt
I-AR21-001 Sun Hope elementary school
Solar Energy 2024 156 0 Detail
1343
Delta Electronics, Inc.
Solar Energy 2024 0 186 Detail
1344
Sunnyfounder Electirc Co., Ltd
Ju-zhong Changhua 1st
Solar Energy 2024 23 0 Detail
1345
Delta Energy Inc.
Daciou Section, no.403
Solar Energy 2024 1 0 Detail
1346
Richmond Power CO., LTD
San Yih Foods, Qionglin
Solar Energy 2024 31 0 Detail
1347
natural power co. ltd.
Solar Energy 2024 30 0 Detail
1348
Greenet
Jiahuang Solar project
Solar Energy 2024 181 0 Detail
1349
natural power co. ltd.
Solar Energy 2024 21 0 Detail
1350
Greenet
Solar Energy 2024 30.285 0 Detail

PAGE 135 OF 206

SHOW

PAGE