T-REC Issuance

Cumulative Generation: 13,416,039 MWh (Through Dec 2025)
6,060,211 MWh Generated (Jan 2025 – Dec 2025)

# Organization name Site name Energy type Year of issuance Generation traded (MWh) Generation remaining (MWh) Detail
5601
Thunderbolt
Dadao Junior High School (Chengzheng Building) Case
Solar Energy 2025 56.606 0 Detail
5602
YIHO Green Energy Transformation Co. Ltd.
NA
Solar Energy 2025 66.836 0 Detail
5603
natural power co. ltd.
na
Solar Energy 2025 102.414 0 Detail
5604
Sunnyfounder Electirc Co., Ltd
Buddha Changhua 5th
Solar Energy 2025 89.101 0 Detail
5605
masterlink securities
Dayu Branch of Masterlink Security corporation
Solar Energy 2025 0 112.313 Detail
5606
Anneal Energy
Chengpin Energy - Kasuke
Solar Energy 2025 65.189 0 Detail
5607
Anneal Energy
Buder PV0185
Solar Energy 2025 75.976 0 Detail
5608
Taiwan Cooperative Bank
Da she Branch
Solar Energy 2025 0 95.309 Detail
5609
Greenet
Solar Energy 2025 98.973 0 Detail
5610
RISINGSTAR ENERGY CO., LTD.
Tainan City Government Public Works Bureau Stadium (Annan District)
Solar Energy 2025 14.644 0 Detail

PAGE 561 OF 640

SHOW

PAGE