T-REC Issuance Detail

Fangbao section Phase 1、Fangbao section Phase 2

powerplant-img

Fangbao section Phase 1、Fangbao section Phase 2

Organization name :
Taiwan Carbon Asset Electrical co., ltd
Energy :
solar
Address :
Land serial no. 334 in Fangbao section, Fangyuan Township, Changhua County, Taiwan (R.O.C.)、Building serial no. 245 Xiaoxi Rd., Fangyuan Township, Changhua County, Taiwan (R.O.C.)
Device Capacity :
1101.595 kW
Certificate No. :
24SP0272-B025000001~405
T-REC Lastest Issued Date :
2026-03-25
Period :
2025-09-01~2025-12-31
Equipment Verified Report :
Verified
Generation Verified Report :
Verified