The solar power plant in Hefong, Pingtung
Organization name :
SanTi Monster electric power Co., Ltd.
Energy :
solar
Address :
The land parcel numbers in the Lion Township section of Pingtung County include: 3-1, 3-9, 3-10, 3-17, 3-22, 3-23, 3-24, 3-25, 3-26, 3-27, 3-28, 3-29, 3-30, 3-31, 3-32, 3-33, 3-34, and 3-35, totaling 18 parcels. In the Haikou section of Checheng Township, the land parcel numbers are: 85, 85-6, 85-8, 85-25, 85-26, 85-27, 85-28, 85-29, 85-30, 85-31, 85-32, 85-33, 85-34, 85-35, 85-36, 85-37, 85-38, 85-39, 85-40, 85-41, 85-42, 85-43, and 85-44, totaling 23 parcels. In total, there are 41 land parcels.
Device Capacity :
34564.41 kW
Certificate No. :
25SP3362-B025000001~3297
T-REC Lastest Issued Date :
2026-05-13
Period :
2025-12-01~2025-12-31
Equipment Verified Report :
Verified
Generation Verified Report :
Verified