T-REC Issuance

Cumulative Generation: 4,145,351 MWh (Through Dec 2023)
1,909,337 MWh Generated (Jan 2023 – Dec 2023)

# Organization name Site name Energy type Year of issuance Generation traded (MWh) Generation remaining (MWh)
591
Auden
Auden Bade Solar System#1
Solar Energy 2023 0 20 Detail
592
First Commercial Bank Co., Ltd.
First Commercial Bank CO., LTD. Tai-Ping Branch
Solar Energy 2023 0 21 Detail
593
First Commercial Bank Co., Ltd.
First Commercial Bank CO., LTD. Chu-Nan Branch
Solar Energy 2023 0 23 Detail
594
National Taiwan University of Science and Technology
Solar Power Station of Dormitory One
Solar Energy 2023 0 22 Detail
595
CPC Corporation, Taiwan
Solar Energy 2023 0 26 Detail
596
TAICHUNG COMMERCIAL BANK Co., Ltd.
TAICHUNG COMMERCIAL BANK Co., Ltd. branch Wufeng office
Solar Energy 2023 0 23 Detail
597
E.SUN COMMERCIAL BANK, LTD.
Esun Boai
Solar Energy 2023 0 11 Detail
598
First Commercial Bank Co., Ltd.
First Commercial Bank CO., LTD. Tou-Fen Branch
Solar Energy 2023 0 12 Detail
599
Chunghwa Post Co., Ltd.
Solar Energy 2023 0 25 Detail
600
First Commercial Bank Co., Ltd.
First Commercial Bank CO., LTD. Tung-Shih Branch Tung-Shih Branch
Solar Energy 2023 0 24 Detail

PAGE 60 OF 66

SHOW

PAGE