T-REC Issuance Detail

Changhua Puxin No.6、No.8 cemetery set up a bidding case for solar photovoltaic power generation system (including relocation and land preparation

powerplant-img
Changhua Puxin No.6、No.8 cemetery set up a bidding case for solar photovoltaic power generation system (including relocation and land preparation
Organization name :
Jie Fu Energy Corporation
Energy :
solar
Address :
Land serial no.1087, Puxin Township, Changhua County
Device Capacity :
1999.8 kW
Certificate No. :
24SP0274-B024000001~1582
T-REC Lastest Issued Date :
2025-02-20
Period :
2024-06-01~2024-12-31
Equipment Verified Report :
Verified
Generation Verified Report :
Verified